From Brief to Beautiful: What to Expect When Working with an Interior Designer
At the end of a first meeting, people who have never worked with a designer tend to ask the same three questions. How long will it take? What happens next? How much of my time will you need?
The answers depend on the size of the project, but the shape of the work stays much the same whether it is one room in a Johannesburg townhouse or a lodge in the Timbavati.

Here is the working with an interior designer process as it runs in our studio, from the first conversation to the day we hand your home back to you.
The brief and the site visit
Everything starts with the brief: how you live, what you dislike, your budget and your deadlines. Our guide on how to brief your designer covers it in detail, and the brief stays our reference point for every decision that follows.
We then visit your home to measure, take photographs and see the rooms at different times of day. We note what is staying, where the plumbing and electrics run, and anything the building’s rules will limit, such as estate guidelines or body corporate approvals. At the end of this stage, we agree the scope and fees in writing, so we both know exactly what the project includes.
Concept
The concept sets the direction. We present a mood board, a colour palette, early material samples and a rough layout, enough to show how the rooms will feel and how you will move through them.
Now is the time to react honestly. Changing direction at this stage costs a conversation. Changing it once the builders are on site costs time and money. Clients sometimes hold back because they don’t want to seem difficult. Please say it anyway. Your first reaction to a concept is the most useful feedback we get.
Design development
Once you approve the concept, we work it up in detail. This stage produces the drawings and documents that builders, joiners and suppliers will work from:
Floor plans showing furniture layouts, joinery and lighting positions
Elevations, which are drawings that show each wall straight on, for kitchens, bathrooms and built-in cupboards
Electrical and lighting plans, down to the height of each plug point
A full specification of finishes, fabrics, furniture and fittings
For a kitchen, this is the stage where we settle every drawer, hinge and pendant with you.
We bring samples to your house so you can see them in your own light. A fabric that looks warm in our studio can turn grey in a south-facing room, and the only way to find out is to hold it up at the window.
Quotes and ordering
Once you sign off the design, we gather quotes from suppliers, craftspeople and contractors and bring them to you for approval.
After you approve the quotes and pay the deposits, we place the orders and track every item until it arrives. Made-to-order furniture, custom joinery and imported fabrics can take several weeks or months, so we order early and plan the rest of the schedule around the longest lead times (the gap between ordering a piece and receiving it).
On site
If the project includes building work, this is the longest stage. We coordinate the trades, visit the site regularly and check the work against the drawings. Something always comes up: a wall that isn’t square, a delivery that runs late, a pipe where nobody expected one. Solving those problems is our job.
You don’t need to manage contractors or chase suppliers. We will need you for the occasional decision, and the faster you can make it, the more smoothly the build runs.
Installation and styling
When the builders finish and the furniture is ready, we install. Furniture goes in, art goes up on the walls, lamps come on, and we add the final layer of cushions, throws, books and objects that makes a room feel lived in.
Installation usually takes a few days. If you can, stay away until it’s done. Walking into a finished room for the first time is worth the wait.
Handover
Before we hand over, we walk through every room with you and draw up a snag list, a record of small defects such as a sticking drawer or a scuffed skirting board. We come back to make sure the contractors fix each one.
How long it takes, and how much of your time
A single room can take a few months from brief to installation. A full renovation or new build often runs for a year or longer, mostly because of building work and the lead times on made-to-order pieces. We give you a realistic timeline at the start, and we tell you as soon as anything changes it.
Most of your time goes into the early stages. Expect several meetings during concept and design development, when we make the big decisions together. Once the orders go in and building starts, we need far less from you.
Make decisions on time: A late choice on a tile or a tap can hold up a whole trade on site.
Tell us who decides: If two of you are commissioning the work, either come to the key meetings together or agree who has the final say.
Raise budget changes early: If your figure moves, tell us before we order. We can adjust a specification on paper far more easily than on site.
If you are thinking about a project, the first step is a conversation. Bring your questions, and we will give you straight answers about time, budget and what we will need from you.